White Papers

    Essential Insights from the Engineers Who Power Critical Battery Systems

    Explore Eagle Eye Power Solutions’ white-paper library for concise case studies, compliance checklists, and best-practice guides—each distilled by our battery-power engineers for quick, actionable insight.

    Get Schooled at Eagle Eye University

    For more industry-related education visit Eagle Eye University.

    Battery Monitoring · Compliance · Pilot Program · Predictive Maintenance · ROI

    10 Reasons Why Investing in a Battery Monitoring Pilot Program is Essential

    Key Takeaways:

    • Catch problems early. A pilot lets you surface weak cells, trending impedance shifts, and temperature spikes before they trigger costly outages.
    • Build a data baseline. Continuous sensing creates the reference set you’ll need for long-term trend analysis and predictive maintenance.
    • Prove ROI quickly. A small-scale deployment quantifies labor savings, reduced truck rolls, and compliance efficiencies—evidence you can present to leadership.
    • Simplify audits. Automated logs align with PRC-005 and IEEE testing requirements, easing regulatory reviews.
    Start small, learn fast, then scale. This paper shows how.

    Compliance · Hydrogen Safety · Sensor Placement · Sensor Technology · Ventilation

    The Importance of H₂ Hydrogen Detection in a Battery Room

    Key Takeaways:

    • Understand the danger zone. Even 4% H₂ by volume reaches the lower explosive limit making active monitoring essential for safety.
    • Code & compliance snapshot. Explains how OSHA 29 CFR 1910, NFPA 2, IEEE 1635, and NERC PRC-005 intersect on hydrogen mitigation.
    • Ventilation math simplified. Concepts and components behind the calculation of room volume concentrations are explained.
    Properly placed H₂ sensors combined with auto-ventilation cut alarm events.

    Battery Inspection · Battery Maintenance · Testing

    Battery Inspection, Maintenance, and Testing

    Key Takeaways:

    • Inspection blueprint. Outlines a step-by-step checklist—visual checks, torque verification, electrolyte-level gauging—for both VRLA and flooded strings.
    • Testing hierarchy. Explains when to run impedance, conductance, or load tests and how each maps to IEEE 450/1188 guidelines.
    • Maintenance intervals that matter. Provides quarterly, annual, and five-year service schedules aligned with NERC PRC-005.
    • Safety first. Includes safety equipment recommendations for technicians working around lead-acid batteries.
    Following this protocol reduced site call-outs.
    by George Pedersen
    , , ,
    by George Pedersen
    , ,
    by Allen Byrne
    , ,
    by Nigel Scott
    , , , ,
    by Allen Byrne
    , ,
    by Allen Byrne
    , ,
    by Nigel Scott
    , ,
    by Allen Byrne
    , ,
    by Allen Byrne
    , , ,
    by Nigel Scott
    , ,
    by Allen Byrne
    ,
    by Allen Byrne
    , ,
    by Kory Hooper
    , , , ,
    by Allen Byrne
    ,
    by Allen Byrne
    , , , ,
    by Allen Byrne
    , ,
    by Allen Byrne
    , ,

    Filter by Tag

    To top