    TALON™ Edge Resistive Portable AC Load Banks apply controlled electrical load to validate critical power equipment during commissioning, acceptance testing, preventive maintenance, and system verification. Designed for data centers, utilities, industrial facilities, rental fleets, and field service applications, TALON™ Edge helps verify performance across generators, UPS systems, switchgear, transformers, and power distribution equipment.

    Built for demanding field environments, the series features rugged portable construction with lifting provisions, forklift access, and heavy-duty casters for easier transport and deployment. Vertical forced-air cooling supports continuous high-power operation and controlled heat rejection during generator testing, UPS validation, and data center floor testing.

    TALON™ Edge supports local panel operation or PC-based control, giving teams flexible control options for: 

    • Manual Load Steps
    • Automated Test Profiles
    • Real-Time Monitoring
    • Data Logging Trend Review
    • Report Exporting

    Integrated protection features include emergency stop, fan interlock, airflow monitoring, over-temperature protection, over-voltage protection, short-circuit protection, audible and visual alarms, and chassis grounding for safe, reliable operation during critical power testing.

    TALON Edge Applications

    • AC Power System Commissioning, Startup & Recommissioning
    • Generator Set (Gen Set) Commissioning, Acceptance Testing & Preventative Maintenance
    • UPS Power System Testing & Validation
    • Switchgear Testing & Verification
    • OEM Factory Production Testing
    • Product Research, Development & Endurance Testing
    • Engine, Emissions & Gas Turbine Testing
    • Renewable Energy System Testing (Solar & Wind)
    • Locomotive Power System Testing
    • Marine Power Generation System Testing
    • Rental Fleet Power Generation Equipment Testing & Maintenance
    • Critical Power Infrastructure Preventative Maintenance Programs

    Time for a Tune-Up?

    If your device needs service or annual calibration let us help.

    Key Features

    • 3-Phase Resistive Design:
      Built for unity power factor loading of generators, UPS systems, switchgear, and distribution equipment.
    • High-Temperature Resistor Elements:
      NiCr alloy resistor elements are designed for stable resistance, high-temperature operation, and continuous-duty load testing.
    • Stainless Steel / Insulated Resistor Construction:
      Resistor assemblies use stainless steel sheathing/supports with high-temperature insulation for durability in the cooling air stream.
    • Defined Load Step Architecture:
      Discrete kW stages support repeatable test setup and controlled load transitions.
    • Vertical Forced-Air Cooling & Heat Rejection:
      Directs heat upward and away from the test area, supporting data center floor testing and controlled
    • De-Rate Capability:
      Supports reduced-voltage testing with kW output adjusted based on applied voltage.

    Specifications

    Voltage Versions3-Phase 3-Wire w/ GND: 480 (nominal) or 240VAC 3P
    3-Phase 4-Wire w/ GND: 480/277VAC 3P/1P (nominal) or 208/120VAC 3P/1P
    kW Models110, 210, 310, 410, 510, 610kW
    Frequency50/60 Hz
    Resolution1 kW
    DimensionsApprox. 49.25″ x 34″ x 71″ (1250 × 864 × 1800 mm)
    (L × W × H, excluding casters and lifting rings)
    Digital DisplayLCD multiple function display meter
    CommunicationRS232/485, USB/RS232 adapter provided
    CoolingHorizontal intake, vertical discharge
    Environmental14 – 122 °F (-10 – 50 °C), ≤95% RH
    ControlLocal panel control or control via PC Software
    Accessories Included• 30ft (10m) RS485 software cable
    • RS485/RS232/USB converter
    • Data management software

    FAQs

    What is a resistive portable AC load bank?

    What is TALON™ Edge used for?

    Can TALON™ Edge be used for generator load testing?

    Can TALON™ Edge be used for UPS system testing?

    What kW sizes are available for TALON™ Edge?

    What voltage configurations are available?

    Does TALON™ Edge support automated test profiles and data logging?

    How is TALON™ Edge cooled?

    What safety protections are included?

    Is TALON™ Edge suitable for rental fleet and field service use?

    What information is needed to quote a TALON™ Edge load bank?

    Request Quote

    To quote the correct configuration, Eagle Eye Power Solutions typically needs the required kW capacity, voltage configuration, phase/wire arrangement, test application, equipment being tested, site conditions, control requirements, reporting/data logging needs, cable or connection requirements, quantity, and project timeline.

    To top